Consisting of a forged foot anchor, 4-leg wire base and plastic void former. The insert is positioned with the void direction toward the top of the panel and then is tied in place to the rebar cage. Lifting Hardware allows quick attachment to the insert and ground release after panel has been erected and braced.
Tilt-Up Construction: The Process of Erecting a Tilt-Up Building Explained
Tilt Up Helical Ground Anchor (HGA) Bracket
The Tilt-up Construction Process - Tilt Wall Ontario Inc.
The Tilt-up Construction Process - Tilt Wall Ontario Inc.
Concrete Accessories
Insulated Tilt-Up Construction
Tilt Up Lift Inserts
Tilt Up Construction - Heyden Supply
The Construction of Tilt-Up by EV&A Architects - Issuu
Blog 2021-01 — Newcomb Construction
First Step - Preparing the Tilt-up Concrete Panel Forms - Tiltup
Tilt-Up Concrete Construction - Intermountain Concrete Specialties